Procurement

Finishes, fixtures and equipment specified from the drawings, bought at trade pricing and delivered to the build schedule.

What's included

What Procurement covers

Materials are where a build quietly loses both money and time. We buy at trade prices through supplier relationships built over a decade of continuous ordering, and — more importantly — we buy against the schedule. The tile arrives the week the tiler does, not two months early to be stored, damaged, and effectively paid for twice.

Every item is specified against the drawings before it is ordered, checked against that specification on delivery, and tracked to the room it belongs in. When something is discontinued or delayed — and on a long-lead item, eventually it will be — we bring you a like-for-like alternative with the price and the date attached, before it turns into a stopped crew.

Priced at
Trade rates through established accounts
Ordered against
The construction schedule, not the wish list
Checked
Against the spec on delivery
Delivered to
The site, sequenced by trade
  • Specified against the drawings
  • Trade pricing, itemized
  • Delivered when crews need it
Materials and equipment staged for a construction procurement order
What you get

Procurement, delivered

Not a description of effort — the documents, approvals and finished work that end up in your hands, and what each one is for.

  • Take-offs & quantities

    Quantities measured off the drawings with the waste allowance stated openly, so you are not buying materials by guesswork.

  • Specification schedule

    Every material and fixture named, with its product code, its supplier and its lead time — the document that stops two trades ordering the same thing differently.

  • Quotes & comparisons

    Priced with more than one supplier where the value justifies it, presented side by side so the choice you are making is visible.

  • Purchase orders & tracking

    Orders placed, confirmed and tracked, with long-lead items flagged against the schedule the moment a date slips.

  • Delivery & site logistics

    Deliveries sequenced against the trade schedule, with parking, hoisting, access and protected storage arranged before the truck arrives.

  • Inspection & claims

    Everything checked against the order on arrival. Damaged, short or wrong goods are returned and chased by us, not by you.

How it runs

Procurement, stage by stage

The order the work actually happens in, and what each stage settles before the next one can start. No stage begins until the one before it is signed off.

  1. Take-off

    Quantities are measured from the drawings rather than estimated from experience, so the first order is close to the last one and the budget line means something.

  2. Specification & sourcing

    Each item is matched to a real product with a real lead time. Anything with a long lead is identified now, because that is what dictates when the crew can be booked.

  3. Quotes & approval

    Options come back to you with prices and dates. You approve the schedule of materials once, and that document becomes the reference everything is ordered and checked against.

  4. Ordering & tracking

    Purchase orders go out against the construction program, and confirmations, part-shipments and slipped dates are tracked so a delay surfaces weeks before it can bite.

  5. Delivery & handover to the trade

    Goods are received, checked against the specification, stored protected and released to the trade that needs them — with the paperwork kept for the warranty file.

Scope

What's in, and what's handled separately

Written down before the estimate rather than argued about at the end. Anything in the right-hand column is either another one of our services or a licensed specialist we bring in for you.

Included as standard

  • Material take-offs measured from the drawings
  • Trade-account pricing across multiple suppliers
  • Long-lead item identification and tracking
  • Equipment hire and plant logistics
  • Delivery scheduling, hoisting and protected storage
  • Delivery inspection against the specification
  • Damage, shortage and return claims
  • Substitution options with price and date attached

Handled separately

  • Client-supplied items, which we receive and protect but cannot warranty
  • Storage once the job has closed out
  • Customs duty on goods imported directly by the owner
  • Owner-direct purchases we were not asked to specify
Questions

Procurement, answered

The things clients ask before they commit — answered plainly, including the times the honest answer is that you don't need us for it.

Yours isn't here?

Ask it directly — you'll get a straight answer from someone who has run the job, not a brochure.

Yes, and plenty of clients do for a finish they have fallen in love with. We will receive it, check it and install it. What we cannot do is warranty a product we did not specify, or absorb the schedule hit if it turns up late, short or damaged.

Get started

Talk to us about Procurement

Tell us the scope and the date you need it done. We'll walk through the drawings, the permits and the budget — no obligation.

  • Free, no-obligation consultation
  • Licensed, bonded & fully insured
  • Design, permits & build in one team
  • Clear timeline and itemized budget