Construction Services

General Contracting

One contract, one supervisor and one number to call — civil, MEP, millwork and finishes run as a single job.

What's included

What General Contracting covers

General contracting is the part of this business that decides whether everything else holds together. Somebody has to own the schedule, price the whole scope, book the trades, meet the inspector and answer for the result — and when that somebody is a coordinator rather than the contractor, every gap between trades becomes a conversation you end up chairing.

We contract for the work, not for the management of it. The core trades are ours, the specialists are people we have used for years, and the price you agree is the price we carry the risk on. One contract, one supervisor, one number to call.

Contract
One agreement, one accountable party
Core trades
Self-performed, not brokered out
On site
A named supervisor, every working day
Priced
Itemized and fixed against a defined scope
  • Single point of accountability
  • Self-performing core trades
  • Fixed, itemized pricing
Two workers among vertical reinforcement columns on a structural site
What you get

General Contracting, delivered

Not a description of effort — the documents, approvals and finished work that end up in your hands, and what each one is for.

  • A defined scope of work

    Written specifically enough that a stranger could read it and know what is included — and, just as importantly, what is not.

  • An itemized fixed price

    Line by line rather than lump sum, so you can see the cost of every decision and what a change would actually move.

  • A dated program

    Built backwards from the date you need the space, with the trade dependencies and the inspection points visible on it.

  • One supervisor

    The same person on site every day the crew is, answering for every trade in the building rather than for one of them.

  • Insurance and compliance

    Licenses, certificates and site-safety documentation in place for us and for every trade we bring through the door.

  • Handover and warranty

    Punch list closed out, systems demonstrated, and the workmanship warranty and manufacturer paperwork handed over together.

How it runs

General Contracting, stage by stage

The order the work actually happens in, and what each stage settles before the next one can start. No stage begins until the one before it is signed off.

  1. Scope and estimate

    We price from the drawings rather than from a square-foot rule of thumb, and we tell you what is excluded at the same time as what is included.

  2. Contract and mobilization

    Scope locked before price is locked, then permits, insurance, long-lead orders and site logistics closed out before anyone arrives with a tool.

  3. Trade procurement

    Specialists booked against the program — not called when the previous trade finishes and asked how soon they can come.

  4. Build and supervise

    Daily supervision, weekly reporting, inspections scheduled ahead of the work reaching them, and any change priced and approved before it happens.

  5. Close out

    Final inspections, sign-off, punch list walked with you, and the documentation package handed over.

Scope

What's in, and what's handled separately

Written down before the estimate rather than argued about at the end. Anything in the right-hand column is either another one of our services or a licensed specialist we bring in for you.

Included as standard

  • Pricing and scoping from the drawing set
  • Trade procurement and contracting
  • Daily site supervision and quality control
  • Program management and weekly reporting
  • Inspection scheduling and coordination
  • Site safety, protection and waste management
  • Change orders priced and approved in writing
  • Punch list through to written sign-off

Handled separately

  • Design and engineering, which are their own services
  • Agency fees and civil penalties, passed through at cost
  • Owner-supplied items, which we install but cannot warranty
  • Anything outside the agreed scope, priced as a change order first
Questions

General Contracting, answered

The things clients ask before they commit — answered plainly, including the times the honest answer is that you don't need us for it.

Yours isn't here?

Ask it directly — you'll get a straight answer from someone who has run the job, not a brochure.

You would be holding every contract, resolving every gap between them, and carrying the cost when two trades disagree about whose scope something was. A general contract moves all of that — and the risk that comes with it — onto us for one price.

Get started

Talk to us about General Contracting

Tell us the scope and the date you need it done. We'll walk through the drawings, the permits and the budget — no obligation.

  • Free, no-obligation consultation
  • Licensed, bonded & fully insured
  • Design, permits & build in one team
  • Clear timeline and itemized budget