
Commercial Renovation
What Commercial Renovation covers
The expensive surprises in commercial work are rarely the construction. They are the scope split between base building and tenant, the freight elevator you can only book at 6am, the certificate of insurance management won't accept, and an electrical service that was never sized for what the space now has to do. We read the work letter and the building rules first, and price against them.
We renovate offices, retail stores and restaurants as one package — design coordination, DOB filings and, where a kitchen or assembly space needs them, Health Department and FDNY filings, and the build itself — against a program that names the day you can open, because every week past it is rent paid against no revenue.
- Spaces
- Offices, storefronts and restaurants
- Priced against
- The landlord's work letter, line by line
- Access
- Freight, after-hours work and COIs planned in
- Delivered to
- An opening date you can put on a lease
- Office, retail & restaurant fit-outs
- Priced against the work letter
- Built to an opening date

Commercial Renovation, delivered
Not a description of effort — the documents, approvals and finished work that end up in your hands, and what each one is for.
A work-letter price
Base-building and tenant scope separated line by line before anything is signed, so the allowance covers what you think it covers.
Capacity checked
Electrical service, HVAC and floor loads verified against what the space has to do — not assumed from the previous tenant.
Filings and approvals
DOB filings, plus Health Department and FDNY where a kitchen or assembly space needs them, run alongside the build rather than after it.
A fit-out for the use
Workstations and meeting rooms for an office, millwork and display lighting for a store, or a restaurant kitchen with its hood, make-up air and grease interceptor.
Building-rules logistics
Freight bookings, after-hours noise limits, certificates of insurance and landlord submittals handled with management as part of the program.
Sign-off to open
Inspections closed, punch list walked, and the certificate and documentation in hand so you can trade.
Commercial Renovation, stage by stage
The order the work actually happens in, and what each stage settles before the next one can start. No stage begins until the one before it is signed off.
Work letter and site review
We read the lease work letter, the tenant criteria and the building rules, and walk the space and its existing services before a drawing is finished.
Scope, price and program
An itemized price with base-building and tenant scope separated, and a program built backwards from your opening date.
Filings and landlord approvals
DOB — and, where they apply, Health Department and FDNY — filed in parallel with the landlord's submittals, so approvals land when the space does.
Build and supervise
Night and weekend phasing where the lease or the building demands it, daily supervision, and changes priced and approved before they happen.
Close out and open
Final inspections, sign-off, punch list and the handover package — timed so the certificate arrives with the keys, not months after.
What's in, and what's handled separately
Written down before the estimate rather than argued about at the end. Anything in the right-hand column is either another one of our services or a licensed specialist we bring in for you.
Included as standard
- Work letter and building-rules review
- Base-building and tenant scope separated in the price
- Electrical, HVAC and floor-load capacity checks
- DOB filings, plus Health Department and FDNY where required
- Landlord submittals, COIs and freight bookings
- Office, retail and restaurant fit-out trades
- Night and weekend phasing where required
- Punch list through to written sign-off
Handled separately
- Base-building work the work letter assigns to the landlord
- Kitchen equipment, fixtures and furniture, unless sourced through our procurement service
- Agency fees and civil penalties, passed through at cost
- Anything outside the agreed scope, priced as a change order first
Construction Services
The build itself — our own trades on site, one supervisor answering for all of them.
- ConstructionCivil, MEP, millwork and finishes built by our own crews under one site supervisor — sequenced, inspected and kept clean.
- Residential ConstructionBrownstones, townhouses, extensions and ground-up homes across New York — built around the family still living there, and filed so the work is legal from day one.
- Commercial RenovationYou're hereOffices, storefronts and restaurants renovated across New York — priced against the landlord's work letter and delivered with the sign-offs you need to open.
- General ContractingOne contract, one supervisor and one number to call — civil, MEP, millwork and finishes run as a single job.
Commercial Renovation, answered
The things clients ask before they commit — answered plainly, including the times the honest answer is that you don't need us for it.
Yours isn't here?
Ask it directly — you'll get a straight answer from someone who has run the job, not a brochure.
Talk to us about Commercial Renovation
Tell us the scope and the date you need it done. We'll walk through the drawings, the permits and the budget — no obligation.
- Free, no-obligation consultation
- Licensed, bonded & fully insured
- Design, permits & build in one team
- Clear timeline and itemized budget
Prefer to reach us directly?
No call centers — you'll talk to the team that runs the build.
- Call+1 929 741 0550
- Emailinfo@maha-construction.us
- Visit169-20 Hillside Avenue, 2nd Floor, Suite 3, Jamaica, NY 11432
- HoursMon–Sat · 9:00 AM – 8:00 PM · Sunday closed