Skip to content
A code-compliance and structural inspection in progress
Post-Construction Services

Inspection

Code and structural checks at every stage of the build, then the final inspections and sign-offs — closed out, never left open.

What's included

What Inspection covers

Inspection means two different things, and we do both. During a build it is the checks that let the next trade start — rough-in, structural, fire-stopping, and the special inspections a filing requires. At the end it is the sequence that turns a finished space into a legal one: final inspections, sign-off, and the certificate that makes the space usable on paper as well as in fact.

We also inspect buildings we did not build. Before you buy, before you sign a lease, or before you go to contract on a renovation, a walk-through by people who file and build in this city tells you what the space really needs — including the work a previous owner did without a permit that lands on you the moment you file anything.

Checked
At every phase, not only at the end
Coordinated
With the filing's special inspections
Written up
With photographs and a route to fix it
Also for
Pre-purchase and pre-lease walk-throughs
  • Stage-by-stage quality checks
  • Inspector walk-throughs
  • Sign-off & certificate closeout
A code-compliance and structural inspection in progress
What you get

Inspection, delivered

Not a description of effort — the documents, approvals and finished work that end up in your hands, and what each one is for.

  • Pre-construction condition survey

    The state of the building before anyone touches it, photographed and recorded — which is what protects you and your neighbors when a crack gets argued about later.

  • Phase inspections

    Structure, rough-in, fire-stopping and close-in checked as the work reaches them, so a defect is caught while it is still open and cheap.

  • Special inspection coordination

    The third-party inspections the permit requires, booked to happen while the work is open rather than after it has been covered up.

  • Written report with photographs

    What was found, what it means, what it takes to fix it and in what order — written by people who price and build the fix, not just name the defect.

  • Punch list

    Every outstanding item listed by room and by trade, tracked to closed, so handover is a document rather than an argument.

  • Final sign-off pack

    Inspections passed, paperwork closed, and the letter of completion or certificate of occupancy in your hands.

How it runs

Inspection, stage by stage

The order the work actually happens in, and what each stage settles before the next one can start. No stage begins until the one before it is signed off.

  1. Scope & records review

    We pull what is on file for the property first — prior filings, the certificate of occupancy, open violations — so the walk-through is checking the building against its own paperwork.

  2. Site walk

    Structure, envelope, egress, mechanicals and finishes, photographed as we go. On a pre-purchase inspection this is where unpermitted alterations usually surface.

  3. Testing & verification

    Where something cannot be judged by eye, it gets verified — levels, moisture, systems under load, and anything the filing requires a third party to witness.

  4. Written report

    Findings, photographs and priorities, separated into what has to be done now, what has to be done before you file, and what can wait.

  5. Re-inspection & close-out

    Once corrections are made we re-check them and carry the file through to sign-off, so the report ends in a resolution rather than a list.

Scope

What's in, and what's handled separately

Written down before the estimate rather than argued about at the end. Anything in the right-hand column is either another one of our services or a licensed specialist we bring in for you.

Included as standard

  • Pre-purchase and pre-lease building inspections
  • Structural condition assessment
  • Code, egress and occupancy compliance review
  • Mechanical, electrical and plumbing rough-in verification
  • Fire-stopping and life-safety checks
  • Special inspection coordination with the filing
  • Punch-list preparation and close-out tracking
  • Final sign-off and certificate follow-through

Handled separately

  • Environmental testing — asbestos, lead and mold — which needs a licensed abatement firm
  • Land surveys and boundary work
  • Appraisals and property valuations
  • Legal opinions on title or tenancy
Category 03

Post-Construction Services

Sign-off, handover, and keeping the building running once you're in it.

Questions

Inspection, answered

The things clients ask before they commit — answered plainly, including the times the honest answer is that you don't need us for it.

Yours isn't here?

Ask it directly — you'll get a straight answer from someone who has run the job, not a brochure.

Yes, and it is a large part of what this service is for. Pre-purchase, pre-lease and pre-contract inspections are all available on their own.

Get started

Talk to us about Inspection

Tell us the scope and the date you need it done. We'll walk through the drawings, the permits and the budget — no obligation.

  • Free, no-obligation consultation
  • Licensed, bonded & fully insured
  • Design, permits & build in one team
  • Clear timeline and itemized budget

Prefer to reach us directly?

No call centers — you'll talk to the team that runs the build.